Download the PM-205 Potential Monitor specification sheet (276 KB PDF).
Calibration and Spare Parts (383 KB PDF).
The operation of well perforation is extremely hazardous; perforation charges are highly dangerous and historically have been prone to misfire. This can be costly if the downhole tubing is perforated in the wrong place and at can be dangerous for the perforation team. Intertek's PM205 monitors stray voltage, ground integrity and FR to help assess the situation before perforation.
PM205 Features include:
Please see the datasheet for more details.
Contact us to see how Intertek can help your organization with PM-205 Potential Monitor.